通用banner
Current location: Home >> News >> Industry information

What do you need to pay attention to the installation of PE siphon parts?

2023-05-11
Second

PE siphon is a kind of pipe connection made of high-tech material, which has high pressure resistance and corrosion resistance, and is widely used in industrial production and civil construction and other fields. In the use of PE siphon parts, in order to avoid leakage, blockage and other problems, you need to pay attention to the following aspects. First of all, it is necessary to check the PE siphon before installation to check whether there is corrosion, damage and other problems, if there is, it needs to be replaced in time to avoid affecting the normal use of the pipeline, and it is necessary to confirm the model, specification, pressure and other parameters of the pipeline during the inspection process. Secondly, the connection method of PE siphon parts should comply with the relevant regulations, generally using rubber sealing ring connection or hot melt connection imported fusion pipe fittings, need to be checked before installation to ensure that there is no damage to the sealing ring, no debris, oil, etc., and use the correct tools to connect.

PE同层虹吸管件的安装需要注意什么?

Third, the installation position of PE siphon parts should be reasonable choice, generally choose the curved elastic fuse fittings in ventilated, dry, adequate light, geometric position must meet the needs of the area; If it needs to be installed underground, it is necessary to choose pipelines with good anti-corrosion performance, and take corresponding sound insulation and moisture proof measures to avoid aging and deformation of pipelines caused by soil moisture. Fourth, before installation, it is necessary to formulate the construction plan according to the needs, and select the appropriate tools and operators for the welding pipe mold, to ensure that the construction is carried out in accordance with the requirements, and to avoid quality problems caused by improper construction operations, such as deformation and damage of the pipeline. Finally, after the installation is completed, it is necessary to carry out pressure testing, water tightness testing, etc., to ensure that there is no leakage at the pipe connection, and it is necessary to develop relevant maintenance measures, regular inspection and maintenance, to avoid problems such as pipeline aging and corrosion, and to ensure the normal service life of the pipeline. In short, the installation of PE siphon parts needs to pay attention to the following points, first of all, to check the connector, choose the appropriate connection method, and carry out the correct installation, followed by a reasonable selection of the installation location, formulate the construction plan and carry out pressure testing and watertight testing, and finally need to establish a maintenance system for regular inspection and maintenance. Ensure the long-term good use effect of the pipeline.


Tags

Hotline
0574-62939789

Add:No. 147 Dushan, Sanqi Town, Yuyao City, Zhejiang Province

Production add:No. 777 West Dalinshan Village, Sanqi Town, Yuyao City, Zhejiang Province

NINGBO HEQI PIPE CO.,LTD. 浙ICP备20004075号-1
Powered by Huaqi Cube Technical Support: Huaqi Cube